Glasgow - High School

Industrial Strength Insulated Concrete Forms (ICF)

Description

2012 ICF Builder Award winner: Heavy Commercial


Project Profile
Type: Public High School
Size: 180,000 sq. ft. (floor)
ICF Use: 31,000 sq. ft. (all exterior walls) 
Total Construction: 420 days
ICF Start-to-Finish Time: 70 days
ICF System: 12" core Fox Blocks


  • Radius wall 52' high with numerous arched openings
  • Prefab steel assemblies used for compound curves in windows bucks
  • Dozens of windows with long lintels required extensive steel
  • LEED-Certified
  • Solar tubes, reflective roofing, and 4" of foam roof insulation